Portfolio
PUBLIC WORKS SAMPLE PROJECTS
2025 | Sleepy Hollow Drive - Street Rehabilitation
Parra & Co was selected by the City of Lake Jackson in February 2024 to provide engineering services for the rehabilitation of more than 7,000 linear feet of Sleepy Hollow Drive, a key residential corridor experiencing significant pavement deterioration after decades of use. Delivered in two phases, the project included a Preliminary Engineering Report completed in November 2024 and civil engineering design finalized in June 2025.
Our team evaluated existing roadway and drainage conditions through field observations, pavement assessments, drainage analysis, and coordinated survey data. Based on those findings, we assessed multiple rehabilitation strategies and developed recommendations to address pavement distress, subgrade instability, localized ponding, and drainage deficiencies. The final design included roadway geometry, cross sections, drainage enhancements, flush header curbs, utility coordination, erosion control measures, and traffic control plans to support staged construction. Based on the preliminary findings, the City selected Lithified Technologies’ Full-Depth Reclamation method for its long-term performance and economic practicality.


2025 | willenberg st - Street Rehabilitation
Parra & Co was engaged by the City of Lake Jackson in February 2024 to provide civil engineering services for the rehabilitation of more than 1,500 linear feet of Willenberg Street, an essential residential roadway experiencing pavement fatigue and drainage deficiencies after years of service. Delivered in two phases, the project included a Preliminary Engineering Report completed in November 2024 and civil engineering design finalized in June 2025.
Our team performed field investigations, pavement assessments, drainage analysis, and hydraulic evaluation of the roadside ditches and cross-culverts to identify the conditions contributing to roadway deterioration. Based on those findings, we evaluated multiple rehabilitation strategies and developed recommendations to address longitudinal cracking, edge deterioration, subgrade instability, and poor water conveyance. The final design included horizontal and vertical alignment refinements, cross-section improvements, drainage enhancements, flush header curbs, utility coordination, erosion control measures, and traffic control plans to support staged construction and continued resident access. Based on the comparative analysis completed during the preliminary phase, the City selected Lithified Technologies’ Full-Depth Reclamation method for its long-term durability, material reuse benefits, and economic practicality.


2025 | balsam st - Street Rehabilitation
Parra & Co was engaged by the City of Lake Jackson in February 2024 to provide civil engineering services for the rehabilitation of more than 500 linear feet of Balsam Street, a residential roadway experiencing pavement deterioration and drainage deficiencies due to aging infrastructure and variable site conditions. Delivered in two phases, the project included a Preliminary Engineering Report completed in November 2024 and civil engineering design finalized in June 2025.
Our team assessed existing roadway, grading, and drainage conditions to identify inconsistent pavement widths, edge failures, rutting, base instability, and water movement affecting long-term pavement performance. Based on those findings, we evaluated full-depth reconstruction and Lithified Technologies’ Full-Depth Reclamation method, comparing each for constructability, material reuse, service life, and economic practicality. The final design included roadway widening to a consistent cross-section, grading corrections, pavement structure refinements, flush header curbs, revised ditch profiles, utility coordination, erosion and sediment control measures, and traffic control plans to support phased construction and continued resident access. Based on the preliminary analysis, the City selected Lithified Technologies’ Full-Depth Reclamation method for its long-term value and reduced construction disruption.


2024 | Eagle Pass Housing Authority - Traffic Control & Road Improvements Findings Report
As a subconsultant to Able City, Parra & Co supported the Eagle Pass Housing Authority in evaluating traffic and pedestrian safety concerns near the 1928 Community A housing development at the intersection of Comm. Antonio M. Garcia Road and 2nd Street. In response to reports of dangerous driving behavior and near-miss incidents, our team conducted a field assessment focused on roadway geometry, approach speeds, sight distance, and existing traffic control conditions.
With public funding constraints in mind, we developed a findings report centered on practical, lower-cost solutions with immediate impact. Recommended alternatives included a traffic circle to calm speeds and improve flow, raised speed cushions to discourage speeding while maintaining emergency access, crash-rated guardrails to protect buildings and pedestrian areas, and architectural barriers to define safer walking space. Each option was evaluated based on site constraints, project priorities, and applicable City of Eagle Pass and TMUTCD standards, giving the Housing Authority a scalable path forward based on urgency, funding, and coordination needs.