LAND DEVELOPMENT - Waste Water Treatment Plant 1

Parra & Co was engaged by HEB to perform the Engineering Design of their Wastewater Treatment Plant (WWTP) for the upcoming Austin 33 store. This includes providing a Preliminary Engineering Report and Irrigation Field Design related services.

During Phase I of this project, the Parra & Co team researched the site with the intent of providing a conceptual sizing of the drip field for a 14,000 gpd
on site WWTP that will serve the new HEB store and produce our Preliminary Engineering Report (PER). This PER included a comparison between a conventional activated sludge system and a secuence match reactor that complies with the existing Texas Land Application Permit. (TLAP)

During phase II, Parra & Co is providing the performance specifications and Construction Documents for the WWTP system and irrigation field. Moreover, our team will provide assistance with permitting, construction inspection, startup, and post-construction/warranty.

Parra & Co received approval of the system from TCEQ in October 2021.

PROJECT MANAGEMENT - Greenline 1
Parra & Co
PROJECT MANAGEMENT - Greenline 3

A sustainable project that consisted of transforming the old 19th hole officers’ air force base lounge into a 4,000+ sq ft restaurant and bar at the Greenlinepark of Brooks.

Parra & Co provided Project Management services, along with Civil Engineering, Permitting, and Construction Administration for the Urbanika Group. The Architect was Gomez Vazquez International (GVI) Within Civil Engineering we provided: Tree & Topographic survey, utility plan, fire protection site plan, grading & drainage plan, rezoning process, as well as mechanical, electric, and plumbing services.

The team focused on providing sustainable solutions within the project’s budget, incorporating a low impact development throughout the design, including bioswales and rainwater harvesting tanks. The project is also connected to the recycled water network of the San Antonio Water System for Sustainable irrigation. Parra & Co continues to provide construction observation as the project further develops.

LAND DEVELOPMENT - Civil Engineering Services 1
Locust Townhomes Rendering

Aster Development created their first project in San Antonio as four town homes in the historic Tobin Hills neighborhood. The Architect was Architectura SA. Our Parra & Co team from brief research noticed that the property had a very old plat that needed to be checked with the City, since it might be deemed antiquated.

The project consisted of developing four townhomes in the Tobin Hill Historic Neighborhood and was approved as a 3-story multifamily structure. Our team received survey, site plan and Geotech report from the architects.

Parra & Co provided Site Civil Construction Documents (SWMP, Traffic Impact Analysis [TIA] worksheet, Site Utility Plan, Site Plan, Grading Plan, Drainage Plan, Fire Protection Plan, Pavement Plan and SWPPP), CPS Coordination, Stormwater Management Plan/Drainage Report and Construction Phase services.

Per request of the historical commission, this project featured a pervious pavement driveway.

Parra & Co in collaboration with Able City and the Diocese of Laredo assisted on the rehabilitation and plaza improvements as part of the San Agustin Plaza Masterplan.

In 2014, the team began to assess, restore, rehabilitate, and improve Laredo’s most recognizable historic structure, which was built in 1872. The focus on the building itself was broadened to include the transitional spaces or plazas to the west and south of the tower. These plazas play a critical role in the experience of the Cathedral’s visitors, and to the urban life playing out in the city around it.

Our design balances the public nature of the plaza and gardens with the need to provide contemplative spaces for religions functions. Civil Engineering was completed in 2020 and the construction was finalized in 2021.

Below find sample projects for Commercial, Non-Profit and Residential Developments.

LAND DEVELOPMENT - COMMERCIAL

HEB Austin 33 WWTP & Irrigation Field Design. Austin, TX

Parra & Co was engaged by HEB to perform the Engineering Design of their Wastewater Treatment Plant (WWTP) for the upcoming Austin 33 store. This includes providing a Preliminary Engineering Report and Irrigation Field Design related services.

During Phase I of this project, the Parra & Co team researched the site with the intent of providing a conceptual sizing of the drip field for a 14,000 gpd on site WWTP that will serve the new HEB store and produce our Preliminary Engineering Report (PER). This PER included a comparison between a conventional activated sludge system and a sequence match reactor that complies with the existing Texas Land Application Permit. (TLAP)

During phase II, Parra & Co is providing the performance specifications and Construction Documents for the WWTP system and irrigation field. Moreover, our team will provide assistance with permitting, construction inspection, startup, and post-construction/warranty.

Parra & Co received approval of the system from TCEQ in October 2021.

LAND DEVELOPMENT - NON-PROFIT

YMCA Cibolo Miracle League Ballfield. Cibolo, TX

Parra & Co was engaged by IM Studios to provide Civil Engineering Services for the new Ballfield land, described as approx. 1.38 acres at 338 S Main Street in Cibolo, TX. Parra & Co was contracted to complete the Civil Engineering Design, Surveying and Storm Water Management Plan for the parcel. The new ballfield was built next to two existing baseball fields in the YMCA Cibolo Sport Complex.

Based on information gathered from the FEMA floodplain Zone AE at the start of the project, an existing creek goes through the parcel from south-east through north-west. The current baseball fields, as well as the new one, fall in the area of minimal flood hazard.

Parra & Co collected background information needed (Arc GIS data; City of Cibolo, TX; and Guadalupe County) and visited with the City of Cibolo regarding the new development at the parcel. Furthermore, our team prepared the Site Civil Construction Documents, Storm Water Management Plan with Drainage Calculations, and Boundary & Topographic Survey.

LAND DEVELOPMENT - COMMERCIAL

Greenline Restaurant. San Antonio, TX

A sustainable project that consisted of transforming the old 19th hole officers’ air force base lounge into a 4,000+ sq ft restaurant and bar at the Greenline park of Brooks.

Parra & Co provided Project Management services, along with Civil Engineering, Permitting, and Construction Administration for the Urbanika Group. The Architect was Gomez Vazquez International (GVI) Within Civil Engineering we provided: Tree & Topographic survey, utility plan, fire protection site plan, grading & drainage plan, rezoning process, as well as mechanical, electric, and plumbing services.

The team focused on providing sustainable solutions within the project’s budget, incorporating a low impact development throughout the design, including bioswales and rainwater harvesting tanks. The project is also connected to the recycled water network of the San Antonio Water System for Sustainable irrigation. Parra & Co continues to provide construction observation as the project further develops.

*Rendering courtesy of GVI

LAND DEVELOPMENT - COMMERCIAL

Jungle Disk Headquarters. San Antonio, TX

Jungle Disk, a San Antonio-based cyber security firm is completely renovating an existing commercial building at 2102 S Presa St. to become their new headquarters. The 4,000 sqft space has been planned to be pandemic-conscious with a sustainable design, including a large outdoor area with solar panels on the patio covers.

Parra & Co was engaged by Jungle Disk to provide Project Management and limited Civil Engineering services for their office building development. Our team provided Site Civil Plans, such as: Existing Conditions / Demolition plan, Site Dimensional Control plan, Grading plan, Utility plan, and Traffic Impact Analysis [TIA] worksheet for permitting assistance. The Parra & Co team also prepared a Storm Water Management Plan and Platting services.

Parra & Co is enjoying working with Jungle Disk as an owner, Able City as the architect and Treco Enterprises who is the general contractor. The solar panels will be provided by Sun Solar.

 *Renderings courtesy of Able City

LAND DEVELOPMENT - RELIGIOUS / NON-PROFIT

San Agustin Cathedral Plaza Rehabilitation & Improvements. Laredo, TX

Parra & Co in collaboration with Able City and the Diocese of Laredo assisted on the rehabilitation and plaza improvements as part of the San Agustin Plaza Masterplan.

In 2014, the team began to assess, restore, rehabilitate, and improve Laredo’s most recognizable historic structure, which was built in 1872. The focus on the building itself was  broadened to include the transitional spaces or plazas to the west and south of the tower. These plazas play a critical role in the experience of the Cathedral’s visitors, and to the urban life playing out in the city around it.

Parra & Co provided Site Civil and Utility Plans for this project. Given that the project is in downtown Laredo, we worked with the City to determine where should the right connections be. Civil Engineering was completed in 2020 and the construction was finalized in 2021.

*Photograph courtesy of Able City

LAND DEVELOPMENT - RESIDENTIAL

Locust Townhomes Development. San Antonio, TX

Aster Developments created their first project in San Antonio in the historic Tobin Hills neighborhood. The design concept is based on enjoying the experience of living in Tobin Hill, “an eclectic place where history and modernity intertwine, creating a unique atmosphere.”

The Parra & Co team from brief research noticed that the property had a very old plat that needed to be checked with the City, since it might be deemed antiquated. The project consisted of developing four townhomes in the Tobin Hill Historic neighborhood was approved as a 3-story multifamily structure.

Once our team received the survey, site plan and Geotech report from the architects (Architectura SA). Parra & Co provided Site Civil Construction Documents (SWMP, Traffic Impact Analysis [TIA] worksheet, Site Utility Plan, Site Plan, Grading Plan, Drainage Plan, Fire Protection Plan, Pavement Plan and SWPPP), CPS Coordination, Stormwater Management Plan/Drainage Report and Construction Phase services. Per request of the historical commission, this project features a pervious pavement driveway.

*Rendering courtesy of Aster Developments.